FPS PLPG Stench System Replacement
(Instrumentation)
Development of project specifications, data sheets, engineering design documentation, instrument schedules, etc. (2020).
BP Caspian Sea Platforms
(Electrical)
Project engineering, man-hour estimates, vendor management, engineering work packs, engineering deliverables technical approval, construction/commissioning technical support, HAZOP attendance, generation of technical notes/proposals, etc. (2018 - 2019).
BP Clair Ridge Platform
(Commissioning)
Coordination of drilling E, C & I commissioning works (onshore & offshore). Including vendor supervision, operations liaison, software configuration management strategy, & commissioning procedures development (South Korea & UK, 2011 - 2018).
Grupo-R Bicentenario
(Commissioning)
Commissioning of drilling VFD switchboards, and LV electrical switchgear, including PLC and MV inverter software and hardware modifications (South Korea, 2010 - 2011).
Mossmorran Rejuvenation Project
(Instrumentation)
Production of requirement specifications and up-revision of plant control narratives to reflect new control system architecture scheme (2010).
FPS Kinneil Train 3 SIS Replacement
(Instrumentation)
Installation of new Triconnex Safety Instrumented System and Honeywell Experion system, replacing obsolete equipment. Project engineering, vendor management, construction/commissioning technical support, HAZOP attendance (2009).
Packaged Compressors
(Hardware & Software)
Development of application software, and UCP design, for various Howden gas compressor applications, on various hardware platforms (Allen Bradley, Siemens & Modicon). Production of associated technical documentation (2007 - 2008).
FEP Plant
PLC Upgrade
(Instrumentation)
Identification of cable management and implementation strategy for 'cut over' of Exxon Mobil Fife Ethylene Plant’s Modicon PLC control systems to Triconnex TMR safety systems (2006).
Electrical Propulsion Drives
(Software)
Development of application software for packaged MV3000 propulsion drives. Alstom Marine Controller (AMC) & Wago I/O hardware platform, with application code produced within IsaGraf programming software (circ. 2004).
Arctic IV PLC Upgrade
(Software)
Development of PLC & SCADA application software for Rig's main control system (GE Fanuc 90-30 redundant PLC platform). (circ. 2003).
Daldowie Fuel Plant
(Software)
Development of Allen Bradley PLC-5 application software & project documentation for new fuel plant site (2001 - 2002).
Drilling Systems
(Commissioning)
Software development and site commissioning of various ac & dc drilling systems (configuration of PLC networks, parameterisation of ac/dc drives, control loop tuning, mud pumps desynchronisation, power management, torque transfers, etc.). (1999 - 2005).
Bypass Gas Plant Upgrade
(Software)
GEM80 PLC system upgrade, with the addition of an InFix SCADA workstation, at Torness Nuclear Power Station (circ. 1998).
Torness IFD1 Protection Channels
(Hardware)
Design and testing of the channel ‘L’ & ‘B’ hard-wired relay protection logic cubicles for the new IFD1 cell at Torness (circ. 1996).
Contact :- info@linconsultants.co.uk